Skip to content
All insights
Security & Reliability30 November 20238 min read

Incident response is a rehearsed capability

Incident response is learned under pressure, which is exactly the wrong time to discover that nobody knows who can make the decision to fail over.

During an incident an organisation reveals its real structure: who can act without approval, who has access, who is trusted to speak to customers, and which dependencies were never as independent as the diagram suggested. None of that is visible in a runbook that has not been exercised.

The usual response to a bad incident is to buy something. The more effective response is to practise, because most of the delay in a serious incident is coordination rather than diagnosis, and coordination is a skill that compounds.

Roles before tools

A functioning response needs three roles filled explicitly: someone directing the response and making trade-off decisions, someone investigating and communicating technical findings, and someone owning external communication. On small teams one person may hold two, but the roles still have to be named out loud.

Ambiguity here is expensive. Two engineers independently restarting services, nobody updating the status page and a decision-maker unavailable for approval are all failures of role clarity, not of engineering skill. They are also cheap to fix before an incident and nearly impossible to fix during one.

The first fifteen minutes

Early decisions set the tone: declare, assign, establish a channel, and start a timeline. Declaring an incident feels like an overreaction until it is obviously late, and the cost of declaring early is a short conversation. Many organisations optimise for not looking alarmist and pay for it in recovery time.

A written timeline is worth more than it appears. It gives the responder team a shared record, prevents repeated investigation of the same hypothesis, and produces the material for a review that is about the system rather than about people's recollections.

  • Declare early, name a responder in charge, open one channel.
  • Record times and decisions as they happen, not afterwards.
  • Stabilise before diagnosing. Customer impact outranks root cause.
  • Give every stakeholder a cadence for updates, and keep it even when there is no news.

Communication is a control

Support, sales and leadership will find out something is wrong within minutes. If they do not hear it from the response team, they will construct their own explanation, and that explanation will reach customers. A predictable update cadence, even one that says nothing has changed, is a control against that.

For regulated or customer-facing services, the same discipline extends to legal and compliance obligations. Knowing in advance who must be notified and within what window turns a legal risk into a checklist item.

Learning without blame theatre

A review that ends with "human error" has taught nothing. The useful question is why the system made the error easy: why the console allowed a destructive action without confirmation, why the alert fired after the customer noticed, why the runbook assumed a step that no longer exists.

Blameless does not mean consequence-free; it means looking at the conditions that produced the outcome. Reviews should end with a small number of owned changes with dates, and those changes should be treated as reliability work rather than as a backlog afterthought.

Practise, then practise the awkward parts

A tabletop exercise costs an afternoon and exposes the gaps that matter: who has production access at 3am, whether the failover has been tested since the last change, whether the status page credentials live with someone on holiday. Run one per quarter, rotate participants, and vary the scenario.

Then rehearse the recovery procedures themselves. Restore a database, exercise the runbook, time the failover. The first attempt is always slower and more surprising than expected, which is exactly why it should not be the attempt that happens during an incident.

Editorial attribution

Insights are written by the Tunnels engineering team from current client work and internal research. They are editorial perspectives, not client case studies. No confidential engagement detail, client identity or unverified performance claim is published.

Key points

  • Name the three response roles before you need them.
  • Declare early and stabilise before diagnosing.
  • Keep a fixed update cadence, including when there is no news.
  • Run tabletop exercises and rehearse recovery quarterly.

This perspective reflects how we approach the problem in client work. If it is close to a decision you are facing, we are happy to discuss it directly.

Discuss a Project

Next step

Tell us what you are trying to solve.

A first conversation is technical, not commercial. Describe the system, the constraint and the outcome you need, and we will tell you honestly whether we are the right partner for it.